WhatsApp +65 8980 8050 sales@yalixautomation.com
YX
YALIX
Automation

YALIX Automation Blog

Legacy modular PLC hardware on an industrial service bench
Latest article
Siemens lifecycle · 6 Nov 2026 · 2 min read

Siemens Discontinued and Phasing-Out Parts in 2026

Check Siemens lifecycle milestones by exact article number and plan purchases for legacy SIMATIC equipment.

Read the article

All Articles

24 articles
Legacy and modern industrial controllers on a service benchMaintenance planning
1 Nov 2026 · 2 min read

How to Plan for Obsolete PLC Spares

Build a practical spare-parts plan for discontinued PLC hardware before a fault turns into an extended production stoppage.

Read article →
Compact and modular industrial controllers displayed on an engineering benchPLC selection
27 Oct 2026 · 2 min read

PLC Brands and Models Compared for Industrial Automation

Compare widely used Siemens, Allen-Bradley, Schneider Electric, Omron and Mitsubishi Electric PLC families.

Read article →
Technician documenting a controller identification plateProcurement
22 Oct 2026 · 2 min read

How to Read an Industrial Automation Part Number Before You Order

Use a nameplate checklist to avoid ordering the wrong revision, voltage or option of an industrial automation spare.

Read article →
Industrial operator displays of several sizes on demonstration standsHMI selection
17 Oct 2026 · 2 min read

HMI Brands and Models for Machine Operator Panels

Compare Siemens SIMATIC, Allen-Bradley PanelView, Schneider Harmony, Omron NA and Mitsubishi GOT operator panels.

Read article →
Technician inspecting industrial electronics at a service benchProcurement
12 Oct 2026 · 2 min read

New, Surplus or Refurbished? How to Buy Automation Spares

Compare automation spare-part conditions and ask suppliers for evidence, testing details and warranty terms before ordering.

Read article →
Engineer reviewing interface drawings near industrial cabinetsSystems integration
7 Oct 2026 · 2 min read

Where Industrial Automation Integrations Usually Break Down

Identify gaps in data mapping, device ownership and error handling before connecting machines or control systems.

Read article →
Industrial touchscreen on a machine operator consoleHMI and controls
2 Oct 2026 · 2 min read

Replacing an Allen-Bradley PanelView HMI Without Losing the Application

Prepare for a PanelView terminal replacement by checking the catalog number, project files, firmware and communications.

Read article →
Terminal blocks, cable glands, ferrules and DIN rail on a workbenchProject procurement
27 Sept 2026 · 2 min read

How to Build a Material Requirements List for an Automation Project

Prepare a complete automation bill of materials covering main devices, installation accessories and commissioning spares.

Read article →
Industrial servo motor beside a servo amplifierMotion control
22 Sept 2026 · 2 min read

Servo Motor and Drive Matching for Legacy Machines

Check motor feedback, mechanical fit and drive compatibility before sourcing a replacement servo component.

Read article →
Factory shift lead coordinating a production stoppage with a tablet and radioDowntime response
17 Sept 2026 · 2 min read

What to Do When a Production Line Goes Down and a Part Is Needed Now

Coordinate fault confirmation, sourcing and delivery during a production stoppage without ordering the wrong component.

Read article →
Industrial variable frequency drives in a training cabinetDrives and motors
12 Sept 2026 · 2 min read

What to Check Before Replacing a Variable Frequency Drive

Prepare a VFD replacement request around the installed drive, motor and load, with the information engineering needs to review compatibility.

Read article →
Engineer using a laptop beside an isolated controller test benchRecovery planning
7 Sept 2026 · 2 min read

How to Test Your Automation Backup Before You Need It

Run a controlled restore drill for PLC, HMI and drive backups and document the time and equipment needed for recovery.

Read article →
DIN-rail industrial Ethernet switches and patch cablesIndustrial networking
2 Sept 2026 · 2 min read

What to Keep in an Industrial Ethernet Spares Kit

Build an industrial networking spares kit around installed switches, fiber links, configuration backups and recovery needs.

Read article →
Photoelectric sensor and reflector mounted beside a conveyorTroubleshooting
28 Aug 2026 · 2 min read

Why Conveyor Sensors Fail Intermittently

Investigate conveyor sensor faults by looking for patterns in product position, mounting and environmental conditions.

Read article →
Organised warehouse shelves storing industrial automation spare partsInventory management
23 Aug 2026 · 2 min read

How to Set Stock Levels for Critical Automation Spares

Set spare-part stock levels using downtime impact, replenishment time and the number of machines that share a component.

Read article →
DIN-rail power supplies and terminal distribution in a control cabinetTroubleshooting
18 Aug 2026 · 2 min read

When Several Control Devices Reset at Once

Use shared symptoms to investigate control power, wiring and load changes before replacing several devices.

Read article →
Maintenance planner reviewing an industrial part beside a laptopProcurement
13 Aug 2026 · 2 min read

How to Write an Urgent Industrial Automation RFQ

Use a short RFQ checklist that gives automation suppliers the part identity, acceptable conditions and delivery deadline upfront.

Read article →
Industrial Ethernet switch and connected patch cablesTroubleshooting
8 Aug 2026 · 2 min read

How to Investigate Intermittent Industrial Network Dropouts

Narrow down industrial network faults using timestamps, topology and device diagnostics.

Read article →
Receiving inspector checking an industrial drive beside its shipping packagingQuality and receiving
3 Aug 2026 · 2 min read

An Incoming Inspection Checklist for Automation Spare Parts

Check part identity, condition, accessories and documentation before an industrial automation spare is released to stores.

Read article →
Operator reviewing alarm history at an industrial consoleTroubleshooting
29 Jul 2026 · 2 min read

Reducing Repeat and Nuisance Alarms on Automated Machines

Review alarm history and operator actions to find the causes of repetitive machine alarms.

Read article →
Technician comparing tooling fixtures beside a packaging lineProduction reliability
24 Jul 2026 · 2 min read

Why Automated Lines Struggle After a Product Changeover

Trace recurring changeover faults to recipes, fixtures, sensor positions and inconsistent handovers.

Read article →
Engineer reviewing a thermal camera in front of an industrial cabinetPreventive maintenance
19 Jul 2026 · 2 min read

Recognising Heat-Related Problems in Control Cabinets

Investigate faults that appear after warm-up by reviewing cabinet conditions, cooling equipment and recent load changes.

Read article →
Industrial electronic modules tagged for root-cause inspectionReliability engineering
14 Jul 2026 · 2 min read

What to Check When the Same Automation Component Keeps Failing

Build a failure history to distinguish isolated defects from installation, application or environmental problems.

Read article →

Reseller Notice: We are resellers of industrial automation and electronic equipment. We are not an Authorized Distributor, representative, or affiliated partner of any listed manufacturers or brands. All trademarks and brand names are the property of their respective owners.