A part that arrives on time can still delay a repair if its revision is wrong or a connector is missing. Incoming inspection is the point where stores can catch these issues while the quotation, packaging and shipment records are still available.
01Compare the unit with the order
Check the manufacturer label, full catalog number, series if specified, and ordered quantity. Inspect the packaging and record any visible damage. Confirm the condition and the included accessories against the accepted quote. Keep photographs where they are required by the purchasing process.
02Hold discrepancies for a decision
If a label, document or accessory does not match the order, record the difference and follow your site's hold procedure. Route the decision to purchasing, engineering or quality as appropriate. Carry out any functional acceptance checks under the site's approved test process.
03Release with a usable record
Attach the part identity and accepted evidence to the stores entry. Record storage location and any restrictions on which assets can use the spare. Link it to the work order when the part was bought for a particular maintenance job.
Need help sourcing a part?
Tell YALIX Automation which inspection documents and accessories your receiving team expects before placing the order.