Choosing a PLC for a new machine starts with the machine’s control requirements. Replacing one in an existing machine starts with the installed architecture. A similar I/O count or price tells you little about whether the replacement will work with the existing rack, application or engineering tools.
01Start with the product family
Use the model families below as starting points when identifying equipment. The full order code is needed to distinguish CPU variants and hardware generations.
02Compare the machine requirements
List the local and remote I/O, communications, motion requirements and any separate safety functions. Then identify the engineering software, supported project version and site standards. For a brownfield replacement, include the rack or base, power supply, connectors and any network interface modules in the review.
03Decide how much change the plant can absorb
A stocked exact replacement can suit a line with little downtime available. A family or brand change calls for engineering time, I/O and network mapping, application conversion where feasible and acceptance testing. Compare the work required to restore production as well as the purchase price of the CPU.
Need help sourcing a part?
Send YALIX Automation your PLC model and complete part number to request a quote.



